Sustainable timberwork to existing bridge at Braunston
CTS recently supplied and installed sustainable ekki hardwood timber handrails and steps to an existing bridge at Braunston over the Grand Union Canal.
The old bridge was in poor condition and had become unsafe for public use. May Gurney contacted CTS to provide the new handrails and Hi-Grip Excel non-slip deck to fit to the existing steelwork and to provide two new sets of steps.
Jane Marriott from British Waterways was delighted with the job and commented 'The work looks great and is a great improvement.
Kevin Leach, Works Manager from May Gurney said 'Congratulation to CTS's team for a cracking job'
Published: Monday, 24th August 2009 at 9:30am

