FSC Boardwalk at Bradford City Park
CTS have just completed a 109m x 3.9m boardwalk in FSC Ekki hardwood at Bradford City Park.
Utilising both the Hi-Grip Excel non-slip deck on the slopes and Hi-Grip Standard on the flat areas the boardwalk is edged with 150 x 400mm sections of FSC Ekki timbers to provide a kerb around the perimeter of the boardwalk.
CTS completed the boardwalk just before Christmas in 2011 for Birse Civils on behalf of client Bradford City Council.
Read moreClapham Common Boardwalk
CTS have just completed a new 62m x 3m Ekki hardwood boardwalk at Clapham Common Mount Pond, Lambeth. Working for main contractor FM Conway this new hardwood boardwalk comprises the non-slip Hi-Grip Excel deck boards to give maximum safety for the public.
Read more
CTS footbridge featured on The One Show
Did you see The One Show last night (Wednesday 19th October)?
Wildlife reporter, Mike Dilger opened his piece about otters flourishing in Dorset standing on one of CTS Bridges. The 122m long x 2m wide cable stay truss bridge was featured many times in the report and even through the bridge was installed over the River Stour at Blandford Forum in 1999 for North Dorset Council, it is still looking good.
Read moreCyclebridge at Bow to Olympic Park
CTS Bridges of Huddersfield have recently installed a new 16m x 3m vierendeel truss cycle bridge and 113m of ramps over the River Lee at Bow.
Read more
River Caldew Footbridge, Carlisle
In 2008 an order was placed with CTS by Volker Stevin on behalf of Cumbria County Council to design, manufacture and install two steel truss footbridges over the River Caldew, Carlisle.
One of the bridges was 34m long x 3.03m wide and the other was a three span bridge totalling 54m x 3.03m comprising of three spans 14m, 26m, 14m. The bridges were manufactured as Vierendeel trusses with a bow top boom.
Read moreFar Moor Stress Laminated Bridge
CTS Bridges worked for 8 weeks in a remote area on the Pennine Way near Horton in Ribblesdale to erect this unique Stress Laminated bridleway bridge. The 53m bridge is the longest of its kind in the world and has been shortlisted for the 2011 Construction Industry Awards and The Wood Awards in the Structural Category.
Read more
Bridge Installation by Hiab Waggon
CTS use Hollingworth Haulage to deliver all their footbridges as they specialise in heavy haulage and abnormal loads. For bridge installations where access allows, their hiab waggon can install the bridge onto prepared abutments. Their skilled drivers off load the bridge and place under the guidance of one of CTS's experienced installation team slinger signallers.
Read more