James' Bridge, Dingwall Nr Inverness

James' Bridge, Dingwall Nr Inverness

The new 26m x 1.5m bridge with Galvanised steel beams and a hardwood Type A parapet provides a durable and robust structure to replace the former footbridge that was shut to pedestrians in 2017.

Read more
Brookes Mill, Huddersfield - ref 4526

Brookes Mill, Huddersfield - ref 4526

A 13.7m x 1.5m footbridge was required to link two car parks at the Heritage Office Park in Armitage Bridge, Huddersfield. 

Read more
Capital Quarter, Cardiff - Job 4549

Capital Quarter, Cardiff - Job 4549

A curved in plan bridge installed at new luxury student accommodation Capital Quarter, Cardiff

Read more
Monet style footbridge - 4618

Monet style footbridge - 4618

This softwood Monet style bridge was delivered to a private customer in Devizes, Wiltshire.

Read more
Banff Links Caravan Park Bridge - Ref 4568

Banff Links Caravan Park Bridge - Ref 4568

Completed 6 days ahead of schedule this 2 span hardwood footbridge was the result of excellent teamwork between CTS Bridges and their client (Aberdeenshire Council), the foundation contractors and the caravan park owners.

Read more
Bespoke structures at Barton Park, Oxford

Bespoke structures at Barton Park, Oxford

CTS were approached to design, manufacture and install a number of bespoke structures at Barton Park, Oxford.  

Read more
Making Waves at Rossall Coastal Defence Ecology Park

Making Waves at Rossall Coastal Defence Ecology Park

Artist Stephen Broadbent was responsible for the design of the Mythic Coast inspired park and the wave effect bridge parapets were part of his concept for the scheme.

CTS's Structural Engineers and in-house timber specialists worked closely with main contractor Balfour Beatty and Broadbent Studios to develop the concept into a buildable solution.

 

Read more
Bespoke bridge for new Travelodge, Bury St Edmunds

Bespoke bridge for new Travelodge, Bury St Edmunds

The new Travelodge at Bury St Edmunds required a footbridge over a large drainage ditch to enable customer to access their car park.  Marshall Building Contractors were the main contractor on the scheme and approached CTS Bridges to provide the bridge.

Read more
Kings Newnham Bridge refurbished with Hi-Grip Excel deck

Kings Newnham Bridge refurbished with Hi-Grip Excel deck

The 200 No FSC Hi-Grip Excel Ekki deck boards were supplied to CLM Construction cut to exact length to ensure a quick and efficient re-fit on site onto the newly refurbished Kings Newnham footbridge.

Read more
FRP Bridge in Poole, Dorset

FRP Bridge in Poole, Dorset

CTS Bridges supplied a 5.8m long x 1.2m wide FRP footbridge to Avon Construction who installed the bridge onto their abutments for Borough of Poole Council in Swanage, Poole, Dorset.

 

Read more