CTS Bridges - Web Page Logo
  • Home
  • Design
  • Bridges
    • All about bridges
    • Steel bridges
    • Timber bridges
    • Steel and timber bridges
    • Kit bridges
    • Further guidance
  • Hi-Grip Decking
  • Landscape Structures
  • Gallery
    • Steel Bridges
    • Timber bridges
    • Steel and Timber bridges
    • Landscape structures
  • About us
    • Our Approach
    • One Stop Shop
    • Commitment to Quality
    • Sustainability
    • Latest News
  • Contact us
    • Contact us
    • Brochure request
    • Decking quote request
    • Bridge quote request
  • Gallery
  • Landscape Structure
Paddington Basin; Decked Platform
Stover; Aerial Walkway
Millenium Dome; Boardwalks
Mile End Park; Ecology building and timberwork
Paddington Basin; Ramps and Steps at night
Watermill Hotel; Veranda and Bridge
Paddington Basin; Ramps and Steps.
Thames Valley Park; Pergola
Cefni; Elevated Boardwalk
Cefni; Boardwalk and Footbridges
Wythall Green; Pergola
Northampton; Viewing Platform
Paddington Basin; Deck at Night
Pitlochry Festival Theatre; Cantilevering Decking and Canopy Structure
Green Park; Timber Cladding
Paddington Basin; Ramps and Steps.

Paddington Basin; Ramps and Steps.

The steel ramp structure was commissioned to provide disabled access to existing structures on the banks of the canal basin. The structure is supported by a series of circular hollow section columns with cantilvering column heads which sprout out of the new decking platform below.
An elegant and lightweight parapet uses horizontal stainless steel wires and timber top rail to provide a maritime feel.
 

Dimensions

Length;   58m

Width;        2m

Client

Fitzpatrick Contractors Ltd

Location

Paddington Basin, London

© Copyright 2010 Concrete and Timber Services Ltd
  • ROSC
  • Construct online
  • FSC
  • nqa
  • UKAS